Name of Work : Construction of Railway over Bridge near Sachana in lieu of L.C. No. 37
Location : Bridge near Sachana in lieu of L.C. No. 37
Concessionaire : NA
Project Cost : Rs.80 Cr
Length: 2.00 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: NA
Concession Period : NA
Paved Shoulders
Hard Side Shoulders
No. Of Toll Sections
Name of Work : Construction of Railway over Bride near Sachana in lieu of L.C. No. 37
Location : N/A
Concessionaire : N/A
Project Cost : Rs.80 Cr
Length: 2.00 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A

Name of Work : Construction of ROB in lieu of existing underpass near Chhayapuri
Location : Near GSFC Junction on Mumbai Delhi Railway Line ne
Concessionaire : Ranjit Projects Pvt. Ltd. Mehsana
Project Cost : Rs. 2706.30 lakhs
Length: 1032 m
Width of Carriage Way : 2 x 7.5m(Dual carriageway) having 1.2 m median & 1.5 m Footpath on either side.
Month / Year of construction completion: March 2003
Concession Period : 181 Months (Including construction period).
Paved Shoulders
Hard Side Shoulders
No. Of Toll Sections
Name of Work : Widening & Strengthening of Himmatnagar By Pass (SH-9) on Built Operate Transfer (BOT) basis
Location : Himmatnagar By Pass (SH-9)
Concessionaire : MSK Project Pvt. Ltd. Baroda
Project Cost : Rs. 7 crore
Length: 8.7 Km
Width of Carriage Way : 7.0 m
Month / Year of construction completion: April 2006
Concession Period : 15 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Improvement and strengthening of Bhuj - Nakhtrana Road (Km. 5/2 to 50/0 of SH - 42) on Built Operate Transfer (BOT) basis
Location : Bhuj - Nakhtrana Road (Km. 5/2 to 50/0 of SH - 42)
Concessionaire : M. S. Khurana Infrastructure and Toll Road Private Limited. Ahmedabad
Project Cost : Rs.35.04 Cr
Length: 45 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: February 2008
Concession Period : 13 years 3 months 2 days
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Improvement and Strengthening of Deesa-Panthavada-Gundri on Built Operate Transfer (BOT) basis
Location : Deesa-Panthavada-Gundri
Concessionaire : M/s Ranjit Toll Road Pvt Ltd.
Project Cost : Rs. 47 Crore
Length: 44.12 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: March 2011
Concession Period : 28 Years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Rajkot- Jamnagar- Vadindar Road. (SH - 25)
Location : Rajkot- Jamnagar- Vadindar Road. (SH - 25)
Concessionaire : L&T Rajkot-Vadindar Tollway Ltd.
Project Cost : Rs.774.80 Cr
Length: 131.65 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: February 2012
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Halol – Godhra - Shmalaji Road. (SH -5)
Location : Halol – Godhra - Shmalaji Road. (SH -5)
Concessionaire : L&T Halol – Shmalaji Tollway Ltd.
Project Cost : Rs.808.65 Cr
Length: 173.03 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: April 2012
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Improvement and strengthening of Kim –Mandvi Road (SH-65) on Built Operate Transfer (BOT) basis
Location : Kim –Mandvi Road (SH-65)
Concessionaire : M/s MSK Projects (Kim-Mandvi Corridor) Pvt Ltd. Vadodara
Project Cost : Rs. 21.10 Crore
Length: 45 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: August 2010
Concession Period : 20 Years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Halol – Godhra - Shmalaji Road. (SH -5)
Location : Halol – Godhra - Shmalaji Road. (SH -5)
Concessionaire : L&T Halol – Shmalaji Tollway Ltd.
Project Cost : Rs.808.65 Cr
Length: 173.03 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: April 2012
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Ahmedabad – Viramgam – Maliya Road. (SH – 7 and SH -17)
Location : Ahmedabad – Viramgam – Maliya Road. (SH – 7 and SH
Concessionaire : L&T Ahmedabad – Maliya Tollway Ltd.
Project Cost : Rs.1015.36 Cr
Length: 180.05 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: Sec - III - April 22
Concession Period : 22 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Completing Six Laning Of Bagodara Tarapur Vasad Road in the State Of Gujarat on DBFOMT Basis( Package-I)
Location : Bagodara Tarapur Vasad Road
Concessionaire : Kalthia Bagodara Tarapur Highway Pvt Ltd.
Project Cost : Rs.490.25 Cr
Length: 53.800 Km
Width of Carriage Way : 6 lane divided dual Carriageway with median.
Month / Year of construction completion: NA
Concession Period : 18 Months + 15 years (O&M)
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections One
Name of Work : Construction of Railway over Bridge near Sachana in lieu of L.C. No. 37
Location : Bridge near Sachana in lieu of L.C. No. 37
Concessionaire : NA
Project Cost : Rs.80 Cr
Length: 2.00 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: NA
Concession Period : NA
Paved Shoulders
Hard Side Shoulders
No. Of Toll Sections
Name of Work : Four lane of Bharuch Dahej Road
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 114 Crore
Length: 48.015 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four lane of Bharuch Dahej Road
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 114 Crore
Length: 48.015 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Widening & Strengthening of Modasa Bypass Road – Km 4/4
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 4 Cr
Length: 4.4 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: 17/01/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Modasa Bypass Road – Km 4/4
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 4 Cr
Length: 4.4 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: 17/01/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Gandhinagar – Gojaria – Visnagar Road – Section – I (Km0/000 to 3/000 & Km 7/600 to 30/000)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 31.24 Cr
Length: 25 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: 30/10/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Gandhinagar – Gojaria – Visnagar Road – Section – I (Km0/000 to 3/000 & Km 7/600 to 30/000)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 31.24 Cr
Length: 25 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: 30/10/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Gandhinagar – Gojaria – Visnagar Road – Km 30/0 to 56/500 (Section II)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 29.80 Cr
Length: 26.5 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: 30/6/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Gandhinagar – Gojaria – Visnagar Road – Km 30/0 to 56/500 (Section II)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 29.80 Cr
Length: 26.5 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: 30/6/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Sarkhej–Dholka-Vataman-Pipli-Dholera-Bhavnagar Road – Km 133/2 to 168/2 (Short Route)
Location : N/A
Concessionaire : N/A
Project Cost : Rs.54 Cr
Length: 35.6 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Sarkhej–Dholka-Vataman-Pipli-Dholera-Bhavnagar Road – Km 133/2 to 168/2 (Short Route)
Location : N/A
Concessionaire : N/A
Project Cost : Rs.54 Cr
Length: 35.6 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening to Six lane of Bharuch-Dahej Road (SH-6) Km 200/0 to 225/0 (Section-I).
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 119.64 Cr
Length: 25 Kms
Width of Carriage Way : N/A
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening to Six lane of Bharuch-Dahej Road (SH-6) Km 200/0 to 225/0 (Section-I).
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 119.64 Cr
Length: 25 Kms
Width of Carriage Way : N/A
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Four laning of Surat – Bardoli Road from NH – 8 Junction (Katodara) to Mahuva Junction Bardoli (Old NH -6) on Built Operate Transfer (BOT) basis
Location : N/A
Concessionaire : N/A
Project Cost : Rs.119 Cr
Length: 17 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Four laning of Surat – Bardoli Road from NH – 8 Junction (Katodara) to Mahuva Junction Bardoli (Old NH -6) on Built Operate Transfer (BOT) basis
Location : N/A
Concessionaire : N/A
Project Cost : Rs.119 Cr
Length: 17 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening to six lane of Bharuch Dahej Road (SH-6) Km 225/00 to 248/200 (Section – II)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 72.76 Cr
Length: 23.2 Kms
Width of Carriage Way : Six lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening to six lane of Bharuch Dahej Road (SH-6) Km 225/00 to 248/200 (Section – II)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 72.76 Cr
Length: 23.2 Kms
Width of Carriage Way : Six lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Construction of Approaches for Proposed ROB in lieu of existing level crossing No. 189/B on SH - 25 Near Jamnagar (Cost Sharing Scheme with Railways)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 7.84 Crore
Length: N/A
Width of Carriage Way : 2 Lane with footpath
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A
Name of Work : Construction of Approaches for Proposed ROB in lieu of level crossing 9-B on Savli – Vadodara (Cost Sharing Scheme with Railway)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 4.73 Crore
Length: 1085 m
Width of Carriage Way : 2 Lane with footpath
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A
Name of Work : Construction of Approaches for Proposed ROB in lieu of existing level crossing No. 22 on SH - 83 Near Umreth (Cost Sharing Scheme with Railways)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 5.89 Crore
Length: N/A
Width of Carriage Way : 2 Lane with footpath
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A
Name of Work : Construction of Approaches for Proposed ROB in lieu of existing level crossing No.264/B on SH - 75 Near Boriavi (Cost Sharing Scheme with Railways)
Location : N/A
Concessionaire : N/A
Project Cost : Rs.18.46 Cr
Length: N/A
Width of Carriage Way : 2 Lane with footpath.
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A
Name of Work : Completing Six Laning Of Bagodara Tarapur Vasad Road in the State Of Gujarat on DBFOMT Basis( Package-II)
Location : N/A
Concessionaire : RKC Infrabuilt(Tarapur-Vasad)Road Project Pvt.Ltd
Project Cost : Rs.603.76 Cr
Length: 48.100Kms
Width of Carriage Way : 6 lane Divided dual Carriagway with medain
Month / Year of construction completion: N/A
Concession Period : 21 Months +15 years(O & M)
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Improvement and Widening of Bhuj – Bhachau Road. (SH - 42)
Location : N/A
Concessionaire : Valecha Kachchh Toll Road Ltd
Project Cost : Rs.256.94 Cr
Length: 77 Kms
Width of Carriage Way : Four Lane 0/00 to 9/215 and 57/900 to 77/700 7 m 9/215 to 57/900
Month / Year of construction completion: N/A
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Construction of Road Over Bridge (Four Lane) Nr. Village Dastan in lieu of LC No. 17/A at Railway Km 18/4-5 Between Station Chalthan & Gangadhra for Surat Bardoli Road (Old N. H : 6)
Location : N/A
Concessionaire : N/A
Project Cost : 59.86
Length: 1650 mtr
Width of Carriage Way : 4 Lane Bridge for main carriageway in ROB approached
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A
Name of Work : Construction of Road Over Bridge (Four Lane) Nr. Village Dastan in lieu of LC No. 17/A at Railway Km 18/4-5 Between Station Chalthan & Gangadhra for Surat Bardoli Road (Old N. H : 6)
Location : N/A
Concessionaire : N/A
Project Cost : 59.86
Length: 1650 mtr
Width of Carriage Way : 4 Lane Bridge for main carriageway in ROB approached
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A
Name of Work : Construction of Railway over Bride near Sachana in lieu of L.C. No. 37
Location : N/A
Concessionaire : N/A
Project Cost : Rs.80 Cr
Length: 2.00 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A

Name of Work : Construction of ROB in lieu of existing underpass near Chhayapuri
Location : Near GSFC Junction on Mumbai Delhi Railway Line ne
Concessionaire : Ranjit Projects Pvt. Ltd. Mehsana
Project Cost : Rs. 2706.30 lakhs
Length: 1032 m
Width of Carriage Way : 2 x 7.5m(Dual carriageway) having 1.2 m median & 1.5 m Footpath on either side.
Month / Year of construction completion: March 2003
Concession Period : 181 Months (Including construction period).
Paved Shoulders
Hard Side Shoulders
No. Of Toll Sections
Name of Work : Widening & Strengthening of Himmatnagar By Pass (SH-9) on Built Operate Transfer (BOT) basis
Location : Himmatnagar By Pass (SH-9)
Concessionaire : MSK Project Pvt. Ltd. Baroda
Project Cost : Rs. 7 crore
Length: 8.7 Km
Width of Carriage Way : 7.0 m
Month / Year of construction completion: April 2006
Concession Period : 15 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Improvement and strengthening of Bhuj - Nakhtrana Road (Km. 5/2 to 50/0 of SH - 42) on Built Operate Transfer (BOT) basis
Location : Bhuj - Nakhtrana Road (Km. 5/2 to 50/0 of SH - 42)
Concessionaire : M. S. Khurana Infrastructure and Toll Road Private Limited. Ahmedabad
Project Cost : Rs.35.04 Cr
Length: 45 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: February 2008
Concession Period : 13 years 3 months 2 days
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Improvement and Strengthening of Deesa-Panthavada-Gundri on Built Operate Transfer (BOT) basis
Location : Deesa-Panthavada-Gundri
Concessionaire : M/s Ranjit Toll Road Pvt Ltd.
Project Cost : Rs. 47 Crore
Length: 44.12 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: March 2011
Concession Period : 28 Years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Rajkot- Jamnagar- Vadindar Road. (SH - 25)
Location : Rajkot- Jamnagar- Vadindar Road. (SH - 25)
Concessionaire : L&T Rajkot-Vadindar Tollway Ltd.
Project Cost : Rs.774.80 Cr
Length: 131.65 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: February 2012
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Halol – Godhra - Shmalaji Road. (SH -5)
Location : Halol – Godhra - Shmalaji Road. (SH -5)
Concessionaire : L&T Halol – Shmalaji Tollway Ltd.
Project Cost : Rs.808.65 Cr
Length: 173.03 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: April 2012
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Improvement and strengthening of Kim –Mandvi Road (SH-65) on Built Operate Transfer (BOT) basis
Location : Kim –Mandvi Road (SH-65)
Concessionaire : M/s MSK Projects (Kim-Mandvi Corridor) Pvt Ltd. Vadodara
Project Cost : Rs. 21.10 Crore
Length: 45 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: August 2010
Concession Period : 20 Years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Halol – Godhra - Shmalaji Road. (SH -5)
Location : Halol – Godhra - Shmalaji Road. (SH -5)
Concessionaire : L&T Halol – Shmalaji Tollway Ltd.
Project Cost : Rs.808.65 Cr
Length: 173.03 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: April 2012
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Four laning of Ahmedabad – Viramgam – Maliya Road. (SH – 7 and SH -17)
Location : Ahmedabad – Viramgam – Maliya Road. (SH – 7 and SH
Concessionaire : L&T Ahmedabad – Maliya Tollway Ltd.
Project Cost : Rs.1015.36 Cr
Length: 180.05 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: Sec - III - April 22
Concession Period : 22 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections

Name of Work : Four lane of Bharuch Dahej Road
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 114 Crore
Length: 48.015 Kms
Width of Carriage Way : 4 lane divided dual Carriageway with median.
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections
Name of Work : Widening & Strengthening of Modasa Bypass Road – Km 4/4
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 4 Cr
Length: 4.4 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: 17/01/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Gandhinagar – Gojaria – Visnagar Road – Section – I (Km0/000 to 3/000 & Km 7/600 to 30/000)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 31.24 Cr
Length: 25 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: 30/10/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Gandhinagar – Gojaria – Visnagar Road – Km 30/0 to 56/500 (Section II)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 29.80 Cr
Length: 26.5 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: 30/6/2012
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening & Strengthening of Sarkhej–Dholka-Vataman-Pipli-Dholera-Bhavnagar Road – Km 133/2 to 168/2 (Short Route)
Location : N/A
Concessionaire : N/A
Project Cost : Rs.54 Cr
Length: 35.6 Kms
Width of Carriage Way : 7 m
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening to Six lane of Bharuch-Dahej Road (SH-6) Km 200/0 to 225/0 (Section-I).
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 119.64 Cr
Length: 25 Kms
Width of Carriage Way : N/A
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Four laning of Surat – Bardoli Road from NH – 8 Junction (Katodara) to Mahuva Junction Bardoli (Old NH -6) on Built Operate Transfer (BOT) basis
Location : N/A
Concessionaire : N/A
Project Cost : Rs.119 Cr
Length: 17 Kms
Width of Carriage Way : Four lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Widening to six lane of Bharuch Dahej Road (SH-6) Km 225/00 to 248/200 (Section – II)
Location : N/A
Concessionaire : N/A
Project Cost : Rs. 72.76 Cr
Length: 23.2 Kms
Width of Carriage Way : Six lane
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A

Name of Work : Completing Six Laning Of Bagodara Tarapur Vasad Road in the State Of Gujarat on DBFOMT Basis( Package-I)
Location : Bagodara Tarapur Vasad Road
Concessionaire : Kalthia Bagodara Tarapur Highway Pvt Ltd.
Project Cost : Rs.490.25 Cr
Length: 53.800 Km
Width of Carriage Way : 6 lane divided dual Carriageway with median.
Month / Year of construction completion: NA
Concession Period : 18 Months + 15 years (O&M)
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections One
Name of Work : Completing Six Laning Of Bagodara Tarapur Vasad Road in the State Of Gujarat on DBFOMT Basis( Package-II)
Location : N/A
Concessionaire : RKC Infrabuilt(Tarapur-Vasad)Road Project Pvt.Ltd
Project Cost : Rs.603.76 Cr
Length: 48.100Kms
Width of Carriage Way : 6 lane Divided dual Carriagway with medain
Month / Year of construction completion: N/A
Concession Period : 21 Months +15 years(O & M)
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A
Name of Work : Improvement and Widening of Bhuj – Bhachau Road. (SH - 42)
Location : N/A
Concessionaire : Valecha Kachchh Toll Road Ltd
Project Cost : Rs.256.94 Cr
Length: 77 Kms
Width of Carriage Way : Four Lane 0/00 to 9/215 and 57/900 to 77/700 7 m 9/215 to 57/900
Month / Year of construction completion: N/A
Concession Period : 20 years
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections N/A

Name of Work : Construction of Road Over Bridge (Four Lane) Nr. Village Dastan in lieu of LC No. 17/A at Railway Km 18/4-5 Between Station Chalthan & Gangadhra for Surat Bardoli Road (Old N. H : 6)
Location : N/A
Concessionaire : N/A
Project Cost : 59.86
Length: 1650 mtr
Width of Carriage Way : 4 Lane Bridge for main carriageway in ROB approached
Month / Year of construction completion: N/A
Concession Period : N/A
Paved Shoulders N/A
Hard Side Shoulders N/A
No. Of Toll Sections N/A

Frequently Asked Questions

As defined in the Concession Agreement signed for the particular Road Project. Generally it includes passenger cars only of an individual residing within defined range of Toll Plazas. Detail information and passes for Local Traffic can be availed from Toll Plaza.

A Board carrying Toll Notification is fixed on the Toll Plaza of the Project Highway. In addition to this, Toll Notification can be found on Website of GSRDC (www.gsrdc.com) for the Road Projects undertaken on PPP mode by GSRDC.

List of exempted vehicles for a particular section of highway is as per User Fee Notification of that section of highway. User Fee Notifications for Roads developed by GSRDC on PPP Mode is available on this website.

The exclusive right, license and authority during the subsistence of a Concession Agreement to construct, operate & maintain the Project for a specified period of time.

The Period of time during which a Concession is granted is known as Concession Period. It means the period beginning from the Appointed Date and ending on the Termination Date.
;